Projects

Revival Church campus aerial view

Revive Church

In May 2023, Developco completed a $12 million renovation of a 120,000 square foot shopping center owned and partially occupied by Revive Church located in Arvada, Colorado. The project included interior renovations of Revive’s church facilities, the creation of a day-care facility operated by Lionsheart Children’s Academy, and exterior enhancements to update the exteriors, parking […]

Revive Church Read More »

Front Range Christian Church

In September 2019, Developco was hired to lead the site selection for a suitable commercial property for this growing church in the fast-growing Castle Rock area. This initiative included seeking both existing buildings and undeveloped land sites. A search of CoStar didn’t turn up a single available building. So Developco created a list of every

Front Range Christian Church Read More »

Kids First Health Care

Kids First Health Care is a non-profit healthcare organization whose vision is that “all children should have health coverage and access to quality health care, regardless of the family’s insurance status or ability to pay.” Kids First serves children ages birth to 21 at eight (8) clinics in four (4) school districts and provides school

Kids First Health Care Read More »

BRAVE Church

BRAVE Church retained Mr. Scott McLean as its Buyer Broker and led the $16 million purchase of the former Denver First Church of the Nazarene property at 3800 E Hampden Avenue on April 14, 2022. With 2,274 fixed seats, this 104,207 square foot building on a 10.66 acre site which will serve as global headquarters

BRAVE Church Read More »

Vista Ridge Retail

Developco was hired by investor Gateway One, LLC to lead the $7 million development of two (2) ground-up retail buildings comprising 22,700 sf in Vista Ridge at 3075 Vista Ridge Drive in Erie, Colorado. The buildings were designed by Bryant Flink Architects, constructed by Waner Construction and leased by Julie McBrearty with SullivanHayes Brokerage. Developco’s

Vista Ridge Retail Read More »

Varra Financial Associates

Tenant Improvement Project Management. Developco led the interior design/engineering, construction oversight, FF&E outfitting and all financial management for this $510,000, 6,000 SF flex office space tenant improvement installation in a brand new office/flex condo purchased by its owners in Louisville, Colorado in 2020.

Varra Financial Associates Read More »

Addenbrooke Classical Academy

Developco led the conversion of a 37,383 SF former multi-tenant office building located at 3605 S. Teller Street in Littleton, Colorado into a new fully-functioning charter high school for $6.6 million. As the school’s advocate and project manager, Developco hit the goal that allowed the school to open on time on August 24, 2020. Developco’s

Addenbrooke Classical Academy Read More »

Regency Centers

Regency Centers owns 416 retail shopping centers across the US and 20 centers along Colorado’s Front Range. As Tenant Coordinator, Development Advisors has advocated for Regency for all Front Range tenant improvement renovations. Developco has been involved on projects for many familiar retailers including Bank of America, UC Health, Verizon, Pacific Dental, Weight Watchers, Ulta

Regency Centers Read More »

Colorado Community Church

For over seven (7) years, Colorado Community Church sought an existing building to purchase and renovate near their existing church facility at 2220 S Chambers Road in Aurora, Colorado. If they were to move too far away, they would risk losing members and breaking up their special multi-ethnic, multi-cultural congregation. Developco identified every building greater

Colorado Community Church Read More »

Real de Minas Restaurant

The Luevanos family operates four Mexican restaurants in Aurora, Colorado. Developco was hired to perform development management services for this ground-up restaurant project. For the past several years, Real de Minas was a tenant at the CornerStar Shopping Center in Aurora, Colorado. On July 28, 2016, the family purchased a 1.1-acre undeveloped land site in

Real de Minas Restaurant Read More »

Cornerstone Coatings

Cornerstone Coatings, one of Colorado’s largest commercial coatings companies, desired to find a building to house its new industrial coatings business.  Developco led the property search resulting in the acquisition of 6121 Clermont Street in Commerce City, Colorado. Developco then led the rezoning, debt financing and project manager responsibilities. The rezoning was necessary to allow

Cornerstone Coatings Read More »

Holland Partner Group

Holland Residential is a national multifamily developer who has developed hundreds of new apartment units in eighteen (18) buildings in the Denver metro area since 2010. Holland retained Developco to oversee retail tenant improvements installed on the first level of the Union Denver building (Downtown Denver), and the MileHouse and Den apartment buildings at Belleview

Holland Partner Group Read More »

Inner City Health Center – Veterans Administration

Inner City Health Center (“ICHC”) purchased a former and now historic US Army Depot building campus comprising five (5) buildings at 3800 York Street in 2008 that included this 8,000 SF building which was vacant for fifteen years until the Veterans Administration (“VA”) leased it for their Community Resource & Referral Center.  The renovation of

Inner City Health Center – Veterans Administration Read More »

Journey Church Colorado

For ten (10) years, Journey operated in a small commercial retail strip center comprising 11,200 SF with only 230 seats for adults and insufficient space for children. Journey could not grow. For six (6) years, Developco diligently chased several existing buildings to purchase knowing that the project budget could not afford a newly constructed church

Journey Church Colorado Read More »

The Salvation Army

The Harbor Light facility in downtown Denver was remodeled and an additional 120 bedrooms were constructed all while keeping the existing facility operating. Developco helped sourced a $13.2 million loan and led all of the pre-construction and construction activities

The Salvation Army Read More »

Harvest Bible Chapel

Harvest Bible Chapel Denver (HBCD) purchased this 75,000 SF church property in Englewood, Colorado in November 2013. By late 2015, HBCD had a vision to expand to multiple sites around the metro Denver area. To record and share their sermons with these future other sites, HBCD needed to upgrade the sound system and make acoustical

Harvest Bible Chapel Read More »

Encounter Church

As construction manager, Drew Kraft was responsible for estimating, permitting, subcontracting, inspection coordination and generally leading all field work for a $1.8MM (hard costs) renovation of an existing 52,000 SF three-story office building into a fully functioning church and education facility. This adaptive re-use in Centennial, Colorado for Encounter Church comprised a 350-seat auditorium, four

Encounter Church Read More »

The Rock Community Church

The Rock reached maximum capacity and needed to expand. CFS was hired to provide complete A to Z services (strategic planning through construction), completing the development of a $13 million, 50,000 SF ground-up development, comprising 900 seats, at 12472 W. Belleview Avenue in Littleton, CO.

The Rock Community Church Read More »

Scroll to Top